Skip to product information
1 of 7

Mewtique

Dog Tie Out Cable for Outside,50FT Heavy Duty Dog Leash&Chains with Swivel Hook,Small-Large Dogs Runner Cable for Dogs Up to 250lbs, Long Lead Line for Yard Outdoor and Camping (250lbs 50FT, Green)

Regular price
$53.90
Regular price
Sale price
$53.90
Shipping calculated at checkout.

About This

  • Reflective Dog Tie Out Cable: 50ft long dog tie out cable, high strength tested for small-large dogs up to 250lbs. Our dog runner cables&leashes are the top choice for free-running dogs in outside, yard or camping, providing more room for running or training and play.
  • Heavy Duty Durable Clip: This outside dog leads&chains with 360° free rotation sturdy clasp, lightweight, durable and rust-proof. The ends of the dog tie out cable will be easily attached to a spiral ground stake, tree trunk or fence. The twist lock does not tangle the cable and is used to keep pets safe outdoors.
  • Chew Proof Dog Leash: Dog tie out cable are made of strong steel wire rope and soft transparent pvc, which are anti-chew and rust-proof. The clip with safety lock allows the dog runner cable to be used in a variety of situations and also as a training leash for dogs.
  • More Size and Color Options: 10/15/20/30/50 feet dog lead line, builds up quickly on a stake, giving your dog more room to roam. Your dog loves the outdoors and can use it in camping, parks, yards or the beach.
  • Dog Cable for Pet Lovers: Dog tie out cable system creates a safe area that allows your dogs to come and go freely while preventing them being distracted and escaping from the camp,yard. This is a good gifts for dog lovers. If you encounter any quality problems with our products, please feel free to contact us, we will solve the problem for you in time.

Overview

  • Size : 250lbs 50FT
  • Color : Green
  • Brand : Evilplan
  • Material : Alloy Steel
  • Product Dimensions : 600"L x 0.2"W
Shipping information

- No EU import duties.
- Ships within 1-2 business days.
- Ships in our fully recyclable and biodegradable signature boxes.

  • Hurry, only 11 items left in stock!
Dog Tie Out Cable for Outside,50FT Heavy Duty Dog Leash&Chains with Swivel Hook,Small-Large Dogs Runner Cable for Dogs Up to 250lbs, Long Lead Line for Yard Outdoor and Camping (250lbs 50FT, Green)
Dog Tie Out Cable for Outside,50FT Heavy Duty Dog Leash&Chains with Swivel Hook,Small-Large Dogs Runner Cable for Dogs Up to 250lbs, Long Lead Line for Yard Outdoor and Camping (250lbs 50FT, Green)
Dog Tie Out Cable for Outside,50FT Heavy Duty Dog Leash&Chains with Swivel Hook,Small-Large Dogs Runner Cable for Dogs Up to 250lbs, Long Lead Line for Yard Outdoor and Camping (250lbs 50FT, Green)
Dog Tie Out Cable for Outside,50FT Heavy Duty Dog Leash&Chains with Swivel Hook,Small-Large Dogs Runner Cable for Dogs Up to 250lbs, Long Lead Line for Yard Outdoor and Camping (250lbs 50FT, Green)
Dog Tie Out Cable for Outside,50FT Heavy Duty Dog Leash&Chains with Swivel Hook,Small-Large Dogs Runner Cable for Dogs Up to 250lbs, Long Lead Line for Yard Outdoor and Camping (250lbs 50FT, Green)
Dog Tie Out Cable for Outside,50FT Heavy Duty Dog Leash&Chains with Swivel Hook,Small-Large Dogs Runner Cable for Dogs Up to 250lbs, Long Lead Line for Yard Outdoor and Camping (250lbs 50FT, Green)
EASY RETURNS 15-day postage paid returns

FAQs

What size should I choose for my dog?

We recommend measuring your dog’s chest girth, neck size, and length to find the perfect fit. If you need assistance, feel free to contact us, and we’ll guide you in choosing the best size!

How do I clean and maintain this product?

For most of our products, we recommend hand washing with mild detergent to keep them looking new. Check the care instructions included with each item for specific cleaning guidelines.

Is this product suitable for all dog breeds?

Yes! Our products are designed to be comfortable and durable for dogs of all breeds, sizes, and coat types. However, if you have a breed with specific needs, we’re happy to recommend the best options for them.

Can I return or exchange this item?

We offer a hassle-free return or exchange policy within 30 days of purchase. The item must be unused and in its original condition. For more details, visit our Returns & Exchanges page.