Skip to product information
1 of 9

Mewtique

Absorbine Flex+Max Horse Joint Supplement Pellets, Highly Palatable, Comprehensive Equine Formula with Glucosamine, MSM, Chondroitin & Flaxseed, 5lb Bag / 30 Day Supply

Regular price
$152.10
Regular price
Sale price
$152.10
Shipping calculated at checkout.

About This

  • Every serving delivers: 10,000 mg of glucosamine - 5,000 mg of MSM - 1,200 mg of chondroitin - 150 mg of HA - 130 mg of Boswellia serrata - plus flaxseed and rice bran.
  • Use at the first signs of stiffness & no loading dose required. Optimized pellets for advanced joint health and mobility - no fillers!
  • Highly concentrated formula supports a horse's muscle, tendon, ligament, synovial fluid, and cartilage health.
  • Administer once daily. A 5lb bag is a 30 day supply / a 10lb bag is a 60 day supply.
  • Made in the USA.
Shipping information

- No EU import duties.
- Ships within 1-2 business days.
- Ships in our fully recyclable and biodegradable signature boxes.

    Absorbine Flex+Max Horse Joint Supplement Pellets, Highly Palatable, Comprehensive Equine Formula with Glucosamine, MSM, Chondroitin & Flaxseed, 5lb Bag / 30 Day Supply
    Absorbine Flex+Max Horse Joint Supplement Pellets, Highly Palatable, Comprehensive Equine Formula with Glucosamine, MSM, Chondroitin & Flaxseed, 5lb Bag / 30 Day Supply
    Absorbine Flex+Max Horse Joint Supplement Pellets, Highly Palatable, Comprehensive Equine Formula with Glucosamine, MSM, Chondroitin & Flaxseed, 5lb Bag / 30 Day Supply
    Absorbine Flex+Max Horse Joint Supplement Pellets, Highly Palatable, Comprehensive Equine Formula with Glucosamine, MSM, Chondroitin & Flaxseed, 5lb Bag / 30 Day Supply
    Absorbine Flex+Max Horse Joint Supplement Pellets, Highly Palatable, Comprehensive Equine Formula with Glucosamine, MSM, Chondroitin & Flaxseed, 5lb Bag / 30 Day Supply
    Absorbine Flex+Max Horse Joint Supplement Pellets, Highly Palatable, Comprehensive Equine Formula with Glucosamine, MSM, Chondroitin & Flaxseed, 5lb Bag / 30 Day Supply
    Absorbine Flex+Max Horse Joint Supplement Pellets, Highly Palatable, Comprehensive Equine Formula with Glucosamine, MSM, Chondroitin & Flaxseed, 5lb Bag / 30 Day Supply
    Absorbine Flex+Max Horse Joint Supplement Pellets, Highly Palatable, Comprehensive Equine Formula with Glucosamine, MSM, Chondroitin & Flaxseed, 5lb Bag / 30 Day Supply
    EASY RETURNS 15-day postage paid returns

    FAQs

    What size should I choose for my dog?

    We recommend measuring your dog’s chest girth, neck size, and length to find the perfect fit. If you need assistance, feel free to contact us, and we’ll guide you in choosing the best size!

    How do I clean and maintain this product?

    For most of our products, we recommend hand washing with mild detergent to keep them looking new. Check the care instructions included with each item for specific cleaning guidelines.

    Is this product suitable for all dog breeds?

    Yes! Our products are designed to be comfortable and durable for dogs of all breeds, sizes, and coat types. However, if you have a breed with specific needs, we’re happy to recommend the best options for them.

    Can I return or exchange this item?

    We offer a hassle-free return or exchange policy within 30 days of purchase. The item must be unused and in its original condition. For more details, visit our Returns & Exchanges page.